1, wheeled excavator in the excavation process, should do “four prohibitions” that: ① prohibit bucket has not left the work surface, according to the wheeled excavator manual, rotary. ② It is forbidden to make a sharp rotation. ③ It is forbidden to use the side of the bucket to scrape the soil pile. ④ Lateral impact of the bucket on the working surface is prohibited.
2、According to the rotation range of the wheel excavator arm, it should be controlled between 45° and 60°, and according to the weight of the wheel excavator, the tilt angle should be controlled between 30° and 45°.
3、According to the wheel excavator walking uphill, the active wheel of the track should be at the back, when going downhill the active wheel of the track is in front and the movable arm is at the back. The big arm is parallel to the track. The slewing mechanism should be in a braked state and the bucket should not be more than 1m above the ground. The slope should be no more than 20° up or down and the speed should be low on the downhill slope, no variable speed skidding.
4. It is forbidden to place the wheeled excavator in the upper and lower mining section at the same time; when the working face is rotating at the same time, a level surface should be selected and obstacles in the passage should be removed.
5、It is forbidden to work under overhead structures such as electric wires, according to the wheeled excavator, not to work under the stop, not to stay in the space for a long time with a full bucket.
6, according to the wheel excavator need to stop on the slope, the bucket must land to the ground, all the lever in the neutral position, stop brake, and should be in the crawler or the rear of the tire pad wedge.
1) The technical condition of the wheel excavator has a major impact on its productivity, especially the dynamics of the engine. In addition, the bucket teeth will increase the bucket cutting resistance by 60-90% when worn, according to the wheel excavator fire protection, so the dull bucket teeth should be replaced.
(2) In the construction organization should be prepared in advance for the driving route of the dump truck, remove the unnecessary uphill ramps. For each digging lane according to the wheel excavator, it is necessary to have an empty return lane each, so as to avoid mutual interference when the dump truck goes in and out. Each running lane should be kept in good order for the tipper to run.
3) Correctly carry out the construction organization design. The number of tipper trucks and the carrying capacity of the tipper trucks should meet the requirements of the production capacity of the wheeled excavator, and the capacity of the tipper trucks should be an integer multiple of the bucket capacity of the wheeled excavator. At the same time, try to use the double put loading method, so that according to the wheel excavator loaded a full, followed by another loaded, because the two dump trucks are parked in according to the wheel excavator bucket unloading soil can reach the arc, so that the bucket downturn loaded and car, reversing and can be filled with another car, so as to improve the loading efficiency.
(4) According to the wheel excavator driver should have skilled operation technology, and try to use compound operation, in order to shorten according to the wheel excavator operation cycle time.