On 25 November 2026 India's Union Cabinet approved an ₹11,000 crore scheme to build up domestic manufacturing of construction equipment, including excavators and loaders. Incentives only start after a two-year set-up period, so contractors still need machines today, and every wheeled excavator India buyers import must already meet CEV Stage V emission rules. Below: what the scheme covers, a compliance checklist for importers, and how dealers and OEM partners can work with us.
If you buy, rent out or distribute a wheeled excavator, India just became more interesting. India's construction equipment industry is already the world's third largest, and the government now wants much more of it made at home. We design and build wheeled excavators and material handlers at our factory in Quanzhou, Fujian, and we work with dealers and OEM partners around the world. This guide explains what the new scheme means for the wheeled excavator India market in 2026–2028, and what to check before you order.

What did India's Cabinet approve on 25 November 2026?
The Cabinet approved the "Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem", run by the Ministry of Heavy Industries (PIB, 25 Nov 2026; Cabinet briefing, 25 Nov 2026). The main points:
- Outlay: ₹11,000 crore over eight years (FY2026-27 to FY2033-34).
- Equipment covered: seven categories that are fully or largely imported, including tunnel boring machines, off-highway trucks, excavators, cranes, loaders, piling rigs and drilling machines.
- Components covered: engines, transmissions, hydraulic systems, undercarriages and drive systems.
- Incentive: 13% falling to 8% of incremental sales value, for approved OEMs and component makers.
- Testing: up to ₹375 crore for a dedicated CIE testing facility at ARAI.
- Market: about ₹97,500 crore in FY2024-25, with about 45% dependent on imports; projected to reach about ₹2,28,100 crore by FY2029-30.
Business Standard noted that the decision came a week after China's licence requirement for exports of tunnel boring machines took effect on 18 November, although the government did not link the two (Business Standard, 25 Nov 2026).
When does the scheme actually change the market?
Not overnight. The incentive is paid on extra sales, and only after factories are set up:
| Period | Scheme phase | What it means for buyers and dealers |
|---|---|---|
| FY2026-27 to FY2027-28 | Gestation: manufacturers set up capacity | Demand from roads, ports and housing continues; most machine supply is unchanged |
| FY2028-29 to FY2032-33 | Sales-linked incentive paid (13% → 8%) | More locally built models and locally made components are likely |
| FY2033-34 | Settlement of final-year incentives | Scheme closes |
Infrastructure is not waiting. At the same Cabinet meeting India approved a ₹4,288 crore second container terminal at Kamarajar Port, Tamil Nadu, with a design capacity of 2.0 million TEU a year, and the briefing says India's ports handled 25.7 million TEU in FY2025-26. Ports, roads and housing all need machines in the next two years, not only after 2028.
Wheeled excavator India demand: where do compact machines fit?
Compact machines are the fastest-moving part of the market. In an October 2026 interview, the managing director of HD Construction Equipment India said mini excavator sales are growing at strong double-digit rates while large excavators grow in single digits. Labour shortages in Kerala first drove the trend, and demand is spreading to Karnataka, Tamil Nadu, West Bengal and Bihar, for residential work, basements, landscaping, agriculture and arecanut and rubber plantations. The company also launched a 5.5 t wheel excavator (Equipment Times, 19 Oct 2026).
Wheeled excavators suit this kind of work. They drive between nearby sites on rubber tyres, do not damage paved roads, and with the right work tool they also handle scrap, logs, sugarcane and port cargo.
What must a wheeled excavator meet to be sold in India?
This is the part many importers underestimate. India moved construction equipment vehicles to CEV Stage V emission norms from 1 January 2025, and according to ICRA the change covers wheeled CEVs, which make up 65–70% of industry volume. ICRA also said AIS-160 Part 2 safety requirements apply from the same date. It estimated that moving from Stage III to Stage V could raise machine costs by more than 12–15%, while the extra cost for engines below 19 kW is expected to be minimal (The Hindu BusinessLine, 8 Jan 2025).
In practice, a wheeled machine built for another market cannot simply be shipped to India. Use this checklist before you sign:
- Engine emission stage and type approval for CEV Stage V: ask for the documents, not just a sticker.
- AIS-160 safety requirements and any certification your customs broker or the authorities ask for.
- Engine power class: engines below 19 kW face lighter emission-control costs than larger ones.
- Parts plan: filters, seals, hoses and tyres held locally, plus emission parts if the engine has after-treatment.
- Warranty terms in writing (we offer 12 months or 2,000 hours) and who carries out service.
- Operator training and a pre-delivery inspection report.
- Work tools: buckets, grabs, forks or pulverizers, and auxiliary hydraulics for them.
Rules change, so confirm the current position with a licensed customs broker or testing agency in India. We will tell you plainly which engine and emission configurations we can supply for your market before you place an order.
Which of our machines suit compact and mid-size work?
Published specifications from our product pages:
| Model | Type | Rated power | Weight | Digging / grab | L×W×H (mm) |
|---|---|---|---|---|---|
| JG08S | Mini wheel excavator | 11 kW (Xinchai) | 800 kg | Dig 9.6 kN | 2817×1000×1490 |
| JG30S | Wheel excavator | 22.1 kW | 2,500 kg | Dig 15 kN | 4200×1300×2520 |
| JG50S | Wheel excavator | 36.2 kW | 4,500 kg | Dig 20 kN | 5350×1500×2680 |
| JG90Z | Sugarcane / log loader | 58.8 kW | 7,000 kg | Grab 0.5–0.6 t | 6000×2100×2850 |
| JG150Z | Scrap recycling handler | 93 kW | 12,500 kg | Grab 0.8–0.9 t | 7200×2500×3000 |
Engine brands and emission stages vary by model and market. Tell us your destination country and we will confirm what we can supply. See the full range on our wheel excavator and material handler pages.

What does the scheme mean for dealers and OEM partners?
For dealers, the next two years are about building a customer base and service capacity while the market grows. For companies planning to build or brand machines locally, the scheme rewards growth in domestic production from FY2028-29. Either way, a reliable manufacturing partner helps:
- Dealers and agents: we are recruiting at national, regional and city level in India and worldwide. We support partners with product training, quality inspection reports and maritime logistics guidance.
- OEM and ODM: we build machines under your brand, colours and configuration for partners worldwide. If you plan to source some components locally in India, tell us early and we will discuss what is technically and commercially possible.
- Markets outside India: the same machines and partner terms apply to dealers in Southeast Asia, the Middle East, Africa, Latin America and Europe, subject to each market's rules.
We have built hydraulic wheeled excavators since 1997, and every machine is tested before it leaves the factory. Read more about us or our OEM wheeled excavator guide.
Get a quote, an OEM proposal or a dealer application
Send us your country, target models, application and expected annual volume. We will reply with configurations and a quotation. OEM is available, and we are recruiting dealers and agents at all levels worldwide. Our online form on the contact page is being updated, so please use email or WhatsApp.
- Email: sales@jgexcavator.com
- Mobile / WhatsApp: +86-15002143331
- Quanzhou JingGong Machinery Equipment Co., Ltd, Heshi Town, Luo Jiang District, Quanzhou City, Fujian Province, P.R. China
- Press Information Bureau, "Cabinet approves Rs.11,000 crore Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem," 25 Nov 2026: pib.gov.in
- Government of India, Cabinet briefing (CIE scheme; Kamarajar Port second container terminal), 25 Nov 2026: static.pib.gov.in (PDF)
- Business Standard, "Cabinet approves ₹11,000 cr scheme for construction equipment manufacturing," 25 Nov 2026: business-standard.com
- The Hindu BusinessLine, "Cost of construction equipment vehicles to increase with new emission regulations: ICRA," 8 Jan 2025: thehindubusinessline.com
- Equipment Times, interview with HD Construction Equipment India, 19 Oct 2026: equipmenttimes.in
- Product data: JingGong product pages for JG08S, JG30S, JG50S, JG90Z and JG150Z.
